sim-manajement-book/worksheets/worksheet-A12.md
hb_alim 9652061f1c feat: complete manuscript — 18 chapters, 18 worksheets, back matter, audit, and PDF build scripts
- foundation/: MASTER-ANCHOR, BOOK-SPEC, BLUEPRINT, WRITING-TEMPLATE, REFERENCE-BANK
- chapters/: 18 bab (bab-01 s.d. bab-18) + 18 outlines
- worksheets/: 18 worksheet pendamping (A01-A18)
- backmatter/: references, glosarium, indeks, kata-pengantar, tentang-penulis
- scripts/: build-book.ps1, build-worksheets.ps1 (Pandoc + XeLaTeX)
- templates/: book-template.tex (B5, Times New Roman, margin sesuai BOOK-SPEC)
- AUDIT-REPORT.md: Phase 6 consistency audit — all gates passed
- PRINT-GUIDE.md: instruksi lengkap cetak PDF

RTI-20252 methodology Phase 1-6 complete. Publication-ready.
2026-04-06 05:05:17 +07:00

154 lines
7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# WORKSHEET A.12 — Matriks Keputusan Solusi SI
> **Bab 12 — Alternatif Solusi: *Custom*, Komersial, dan *Cloud***
> Dokumen ini bersifat *standalone* — dapat dikerjakan tanpa membuka buku teks.
---
## Ringkasan Materi
### Pipeline Konsep Bab 12
```
Design Brief (dari Bab 11) → Tiga Jalur: Custom / COTS / SaaS
→ Evaluasi: Kesesuaian × TCO × Waktu × Skalabilitas × Keamanan × Exit
→ Keputusan Solusi → Exit Strategy
```
### Tabel Komparasi: Build vs Buy vs Rent
| Dimensi | *Custom Development* | COTS (Paket Komersial) | SaaS (*Cloud*) |
|---------|---------------------|----------------------|-------------|
| Kontrol | Penuh | Terbatas oleh vendor | Minimal |
| Waktu *deploy* | 618 bulan | 39 bulan | 14 minggu |
| Biaya awal | Tinggi | Menengahtinggi | Rendah |
| Biaya *recurring* | Rendah (*maintenance*) | Menengah (lisensi) | Tinggi (*subscription*) |
| Kustomisasi | Tidak terbatas | Terbatas (konfigurasi) | Minimal |
| Risiko utama | *Developer turnover*, *bug* | *Vendor lock-in* | Data *sovereignty*, *outage* |
| Cocok untuk | Kebutuhan sangat unik | Proses standar industri | *Quick deployment*, UMKM |
### Definisi Kunci
1. **TCO** (*Total Cost of Ownership*) — total biaya SI selama siklus hidupnya: akuisisi + operasional + biaya tersembunyi. Organisasi yang tidak menghitung TCO mengalami *budget overrun* rata-rata 45%.
2. ***Vendor Lock-in*** — ketergantungan pada satu vendor sehingga biaya beralih menjadi prohibitif. 34% organisasi yang migrasi mengalami durasi 18 bulan dan biaya 150% di atas estimasi.
3. **SaaS / PaaS / IaaS** — tiga model layanan *cloud*: *Software*, *Platform*, *Infrastructure as a Service*. Masing-masing memiliki implikasi bisnis yang berbeda.
### Prinsip Utama
1. Tidak ada solusi universal terbaik — hanya solusi paling tepat untuk konteks spesifik.
2. TCO 5 tahun, bukan harga awal, harus menjadi basis perbandingan. Harga akuisisi hanya 3040% dari total biaya.
3. *Vendor lock-in* adalah risiko di ketiga jalur — rencanakan *exit strategy* sejak evaluasi awal.
4. Tren: *composable architecture* — merakit komponen *best-of-breed* via API.
---
## Template A.12 — Matriks Keputusan Solusi SI
```
TEMPLATE A.12 — MATRIKS KEPUTUSAN SOLUSI SI
Tanggal : ________________________________________
Organisasi : ________________________________________
Proyek SI : ________________________________________
═══════════════════════════════════════════════════════════════
A. RINGKASAN KEBUTUHAN (dari Design Brief A.11)
Tujuan SI : ________________________________________
Output kritis : ________________________________________
Timeline : ________________________________________
Budget : ________________________________________
B. EVALUASI 3 ALTERNATIF (skor 110)
| Kriteria (bobot) | Custom | COTS | SaaS | Keterangan |
|-------------------------------|--------|------|------|-------------------|
| Kesesuaian fungsional (30%) | __/10 | __/10| __/10| _________________ |
| TCO 5 tahun (25%) | __/10 | __/10| __/10| _________________ |
| Waktu deployment (15%) | __/10 | __/10| __/10| _________________ |
| Skalabilitas (10%) | __/10 | __/10| __/10| _________________ |
| Keamanan & compliance (10%) | __/10 | __/10| __/10| _________________ |
| Exit strategy (10%) | __/10 | __/10| __/10| _________________ |
| TOTAL SKOR TERTIMBANG | ______ | _____| _____| _________________ |
C. ANALISIS TCO 5 TAHUN (Rp juta)
| Komponen | Custom | COTS | SaaS |
|--------------------------------|--------|------|------|
| Akuisisi / lisensi | ______ | _____| _____|
| Development / kustomisasi | ______ | _____| _____|
| Subscription / tahun × 5 | ______ | _____| _____|
| Training | ______ | _____| _____|
| Maintenance | ______ | _____| _____|
| Hidden cost estimate | ______ | _____| _____|
| TOTAL TCO | ______ | _____| _____|
D. ANALISIS RISIKO
Custom : ________________________________________
COTS : ________________________________________
SaaS : ________________________________________
E. REKOMENDASI
Alternatif terpilih : ________________________________________
Alasan utama (3) : 1. ____________________________________
2. ____________________________________
3. ____________________________________
Exit strategy : ________________________________________
```
---
## Latihan
### Latihan 1 — Evaluasi Kebutuhan: Custom, COTS, atau SaaS?
Untuk 3 fungsi SI di organisasi Anda, tentukan jalur yang paling tepat.
| Fungsi SI | Keunikan Proses | Budget | Timeline | Jalur Terbaik | Alasan |
|-----------|----------------|--------|---------|--------------|--------|
| *Sistem antrian pasien klinik — alur antrian sangat spesifik per poli* | *Tinggi — tidak ada COTS yang cocok* | *Rp 150 juta* | *3 bulan* | *Custom* | *Kebutuhan unik, budget cukup, tim developer lokal tersedia* |
| ________________________ | ____________ | ____________ | ________ | ____________ | ________________________ |
| ________________________ | ____________ | ____________ | ________ | ____________ | ________________________ |
### Latihan 2 — Hitung TCO 5 Tahun
Bandingkan TCO untuk satu proyek SI dengan ketiga alternatif.
| Komponen | Custom (Rp juta) | COTS (Rp juta) | SaaS (Rp juta) |
|----------|-----------------|----------------|----------------|
| *Akuisisi/lisensi* | *0 (bangun sendiri)* | *200* | *0* |
| *Development/kustomisasi* | *300* | *50* | *0* |
| *Subscription (5 tahun)* | *0* | *0* | *60/th × 5 = 300* |
| *Training* | *30* | *20* | *10* |
| *Maintenance* | *50/th × 5 = 250* | *40/th × 5 = 200* | *0 (termasuk)* |
| *Hidden cost* | *50* | *30* | *20* |
| **TOTAL TCO** | **630** | **500** | **330** |
### Latihan 3 — Exit Strategy
Rancang strategi keluar untuk solusi SI Anda.
| Aspek | Rencana | Action Item |
|-------|---------|-------------|
| *Data portability* | *Ekspor data ke format CSV/JSON setiap bulan* | *Negosiasikan klausul data export di kontrak* |
| Vendor dependency | ________________________ | ________________________ |
| Migration plan | ________________________ | ________________________ |
| Contractual safeguard | ________________________ | ________________________ |
---
## Refleksi
1. Organisasi Anda sudah menggunakan beberapa SI — apakah ada yang mengalami *vendor lock-in*? Apa tanda-tandanya dan bagaimana mitigasinya?
2. Mengapa harga murah di awal (seperti SaaS) bisa menjadi mahal dalam 5 tahun — dan apa implikasinya bagi cara Anda mengevaluasi vendor?
---
## Self-Check
```
[ ] Saya bisa membandingkan 3 alternatif solusi (Custom, COTS, SaaS) berdasarkan 6 kriteria
[ ] Saya bisa menghitung TCO 5 tahun dan memahami bahwa harga akuisisi bukan satu-satunya faktor
[ ] Template A.12 sudah terisi lengkap dengan evaluasi, TCO, analisis risiko, dan rekomendasi
```