sim-manajement-book/worksheets/worksheet-A13.md
hb_alim 9652061f1c feat: complete manuscript — 18 chapters, 18 worksheets, back matter, audit, and PDF build scripts
- foundation/: MASTER-ANCHOR, BOOK-SPEC, BLUEPRINT, WRITING-TEMPLATE, REFERENCE-BANK
- chapters/: 18 bab (bab-01 s.d. bab-18) + 18 outlines
- worksheets/: 18 worksheet pendamping (A01-A18)
- backmatter/: references, glosarium, indeks, kata-pengantar, tentang-penulis
- scripts/: build-book.ps1, build-worksheets.ps1 (Pandoc + XeLaTeX)
- templates/: book-template.tex (B5, Times New Roman, margin sesuai BOOK-SPEC)
- AUDIT-REPORT.md: Phase 6 consistency audit — all gates passed
- PRINT-GUIDE.md: instruksi lengkap cetak PDF

RTI-20252 methodology Phase 1-6 complete. Publication-ready.
2026-04-06 05:05:17 +07:00

7.7 KiB
Raw Blame History

WORKSHEET A.13 — Change Readiness Assessment

Bab 13 — Implementasi Sistem Informasi Dokumen ini bersifat standalone — dapat dikerjakan tanpa membuka buku teks.


Ringkasan Materi

Pipeline Konsep Bab 13

Solusi Terpilih (dari Bab 12) → Persiapan: People × Process × Technology
  → ADKAR (Awareness → Desire → Knowledge → Ability → Reinforcement)
  → Deployment (Phased / Big Bang / Pilot) → Hypercare
  → Stabilisasi → User Adoption → Business Outcome

Tabel Komparasi: Implementasi Berhasil vs Gagal

Dimensi Berhasil Gagal
Sponsor eksekutif Aktif, visible, konsisten Pasif, delegasi penuh ke IT
Change management Terintegrasi sejak perencanaan Afterthought — "nanti saja"
Pelatihan Hands-on, bertahap, dengan pendampingan 1× training massal, selesai
Keterlibatan pengguna Sejak desain konseptual Baru dilibatkan saat UAT
Migrasi data Dibersihkan, divalidasi, diuji "Copy paste, perbaiki nanti"
Support pasca go-live Hypercare 24 minggu "Hubungi help desk kalau ada masalah"
Metric keberhasilan User adoption, business outcome "Sistem sudah live" = selesai

Definisi Kunci

  1. Manajemen Perubahan (Change Management) — pendekatan terstruktur untuk membantu individu dan organisasi bertransisi ke kondisi baru. Memastikan pengguna mau dan mampu menggunakan sistem baru.
  2. User Adoption — tingkat di mana pengguna benar-benar menggunakan SI baru secara konsisten — bukan sekadar "bisa login."
  3. Change Champion — individu yang secara aktif mendukung perubahan dan menjadi jembatan antara tim proyek dan pengguna akhir.

Prinsip Utama

  1. 70% proyek SI gagal — pola kegagalan berulang: scope creep, sponsor menghilang, resistensi pengguna, pelatihan tidak memadai.
  2. Urutan PPT: pastikan People siap, Process sudah TO-BE, baru deploy Technology.
  3. Model ADKAR: setiap elemen harus dipenuhi berurutan — lompati satu langkah, resistensi muncul.
  4. Hypercare 24 minggu pertama pasca go-live adalah periode paling kritis.

Template A.13 — Change Readiness Assessment

TEMPLATE A.13 — CHANGE READINESS ASSESSMENT

Tanggal           : ________________________________________
Proyek SI         : ________________________________________
Asesor            : ________________________________________

═══════════════════════════════════════════════════════════════

A. PEOPLE READINESS

| Aspek                           | Skor (15) | Evidence          | Action Needed     |
|---------------------------------|-----------|-------------------|-------------------|
| Sponsor eksekutif aktif         | ___       | _________________ | _________________ |
| Manajer menengah mendukung      | ___       | _________________ | _________________ |
| Pengguna aware & willing        | ___       | _________________ | _________________ |
| Training plan tersedia          | ___       | _________________ | _________________ |
| Change champion teridentifikasi | ___       | _________________ | _________________ |

B. PROCESS READINESS

| Aspek                           | Skor (15) | Evidence          | Action Needed     |
|---------------------------------|-----------|-------------------|-------------------|
| Proses TO-BE sudah divalidasi   | ___       | _________________ | _________________ |
| SOP baru sudah disiapkan        | ___       | _________________ | _________________ |
| Data migration plan ada         | ___       | _________________ | _________________ |
| Rollback plan ada               | ___       | _________________ | _________________ |

C. TECHNOLOGY READINESS

| Aspek                           | Skor (15) | Evidence          | Action Needed     |
|---------------------------------|-----------|-------------------|-------------------|
| Infrastruktur siap              | ___       | _________________ | _________________ |
| UAT selesai & sign-off          | ___       | _________________ | _________________ |
| Integration tested              | ___       | _________________ | _________________ |
| Help desk ready                 | ___       | _________________ | _________________ |

═══════════════════════════════════════════════════════════════

TOTAL SKOR: ___/65

Interpretasi:
  5065 : GO — siap implementasi
  3549 : CONDITIONAL GO — perbaiki semua item dengan skor ≤ 2
  < 35  : NO-GO — tunda implementasi sampai readiness memadai

CATATAN & ACTION PLAN:
________________________________________________________
________________________________________________________
________________________________________________________

Latihan

Latihan 1 — Diagnosa ADKAR

Untuk proyek SI yang sedang atau akan berjalan, evaluasi setiap elemen ADKAR.

Elemen ADKAR Skor (15) Evidensi Tindakan Jika < 3
Awareness — apakah pengguna tahu MENGAPA berubah? 2 — most staff only heard rumors, no formal communication Belum ada town hall atau email resmi dari direktur Town hall + email dari Direktur, jelaskan "mengapa" bukan "apa"
Desire — apakah pengguna MAU berubah? ___ ________________________ ________________________
Knowledge — apakah pengguna TAHU cara menggunakan? ___ ________________________ ________________________
Ability — apakah pengguna MAMPU menggunakan? ___ ________________________ ________________________
Reinforcement — apakah ada mekanisme yang SUSTAIN? ___ ________________________ ________________________

Latihan 2 — Identifikasi Resistensi

Petakan sumber resistensi dan strategi mengatasinya.

Stakeholder Bentuk Resistensi Alasan di Baliknya Strategi
Admin gudang (5 orang) Menolak input data via tablet, tetap pakai buku catatan Takut salah, belum terbiasa teknologi, merasa "diawasi" Training hands-on 1-on-1, tunjukkan manfaat (tidak perlu hitung manual), libatkan sebagai beta tester
________________________ ________________________ ________________________ ________________________
________________________ ________________________ ________________________ ________________________

Latihan 3 — Rencana Hypercare

Rancang rencana support untuk 4 minggu pertama pasca go-live.

Minggu Fokus Support Team Channel Eskalasi
1 — Stabilisasi Bug fixing, data correction, user hand-holding 2 developer + 3 change champion on-site WhatsApp group + tatap muka langsung Bug kritis: response < 2 jam
2 ________________________ ________________________ ____________ ____________
3 ________________________ ________________________ ____________ ____________
4 ________________________ ________________________ ____________ ____________

Refleksi

  1. Pernahkah Anda mengalami implementasi SI yang "secara teknis berhasil" tetapi "secara adopsi gagal" — apa yang seharusnya dilakukan berbeda?

  2. Mengapa change management sering dianggap "nice to have" padahal data menunjukkan itu faktor #1 keberhasilan implementasi?


Self-Check

[ ] Saya bisa mengevaluasi kesiapan implementasi di 3 dimensi (People, Process, Technology)
[ ] Saya bisa menggunakan model ADKAR untuk mendiagnosis dan mengatasi resistensi perubahan
[ ] Template A.13 sudah terisi lengkap dengan skor, evidensi, dan action plan